Problem, approach, and the outcome
The client is a Dutch logistics operator whose track-and-trace systems ran across 14 hand-built Kubernetes clusters. These systems are business-critical: customers and operations depend on live tracking.
The clusters had diverged over time into snowflakes, and the operational load of keeping them all running and upgraded fell on a stretched platform team.
Track-and-trace ran on a sprawl of 14 hand-built clusters that had diverged over time, each with its own quirks. No two were quite the same, so nothing could be done once and applied everywhere.
Every upgrade was risky because no two clusters were quite the same, and the operational load fell on a stretched team. Routine maintenance had become a source of both toil and anxiety.
The operator needed one consistent, governed platform without a disruptive migration of critical tracking workloads. Consolidation could not come at the cost of live tracking.
We standardised on a single governed platform with GitOps delivery, so cluster state is declared in version control and drift disappears. Declaring desired state, rather than hand-tuning clusters, is what ends the snowflake problem.
Automated, tested upgrades replaced the risky manual ones, making patching routine rather than an event. The fear went out of maintenance because the process became repeatable and reversible.
Workloads migrated cluster by cluster, so tracking stayed live throughout the consolidation, and the shared platform cut the operational surface the team had to carry. Fewer, consistent clusters meant far less toil.
- 14 clusters consolidated to one platform
- 55% cut in operational toil
- Automated, low-risk upgrades
- GitOps-declared state ends configuration drift
More Cloud & DevOps case studies

Connected-vehicle platform for a carmaker
Built a cloud platform ingesting telemetry from 1.2M connected vehicles at scale.
Read the full case study
Secure landing zone for a government department
Stood up a compliant, multi-account landing zone for a government department in 7 weeks.
Read the full case study
Datacenter exit for an NHS hospital group
Migrated 900 clinical workloads off two datacentres to the cloud with zero downtime on patient-facing systems.
Read the full case studyGet a senior architect on the call, first time, every time.
No SDR gauntlet. 30 minutes with an engineer who can scope the problem, name the risks, and give you an honest feasibility call.