Skip to content
BritonOne Technology
Cloud & DevOpsManufacturing

Factory-systems migration for a manufacturer

Lifted MES and quality systems to the cloud across nine plants, cutting infrastructure cost 34%.

34%
AzureTerraformAKSAzure Arc
Factory-systems migration for a manufacturer
IndustryManufacturing
DisciplineCloud Migration
CountryGermany
Headline result34%
The story

Problem, approach, and the outcome

About the client

The client is a German manufacturer operating nine plants, each running its own ageing on-site servers for MES and quality systems. On the factory floor, downtime on these systems stops production directly.

Managing nine independent, divergent estates was expensive and made every change a multi-site undertaking with nine ways to fail.

The challenge

Each of nine plants ran its own ageing servers, so every change became a nine-site rollout with nine ways to go wrong. The lack of standardisation multiplied both cost and risk.

Downtime on those systems hit the production line directly, making upgrades something everyone avoided. Avoidance, in turn, let the estate age further and the risk grow.

The manufacturer needed to modernise and standardise without ever risking a stalled line. Continuity of production was the hard constraint around the whole programme.

Our approach

We standardised the estate so all nine plants shared one operating model rather than nine snowflakes. A single model is what makes future changes routine instead of nine separate projects.

Migration ran plant by plant behind Azure Arc, so each site moved independently and issues stayed contained. We kept edge fallbacks in place for shop-floor continuity, so a connectivity blip never stopped the line.

Sequencing started with a pilot plant to prove the pattern before the rollout scaled, so the approach was validated on one site before being trusted across all nine. Risk was contained to a single plant at a time.

Results
  • MES and quality systems migrated across nine plants
  • 34% cut in infrastructure cost
  • Edge fallback keeps the line running
  • One standard operating model across all sites
Next step

Get a senior architect on the call, first time, every time.

No SDR gauntlet. 30 minutes with an engineer who can scope the problem, name the risks, and give you an honest feasibility call.