Cloud migration for an omnichannel retailer
Re-platformed e-commerce to the cloud, holding availability through a record peak-season trading day.
0 outages
Problem, approach, and the outcome
The client is a UK omnichannel retailer whose e-commerce estate had to withstand extreme peak-season traffic. For a retailer, the busiest trading days of the year are also when an outage is most costly.
Their on-prem infrastructure buckled predictably every peak season, turning their biggest revenue opportunities into their biggest operational risks.
The on-prem estate buckled every peak season, turning the retailer's busiest, most valuable trading days into its most fragile. The pattern was familiar and the cost of it was mounting each year.
A straight lift-and-shift risked carrying that fragility into the cloud, paying more for the same failure modes. Simply relocating the problem was not an option.
The re-platform had to be timed and proven against the trading calendar, where an outage on peak day is measured directly in lost revenue. There was no room to get the timing or the capacity wrong.
We migrated the storefront and checkout onto elastic services that scale with demand instead of a fixed hardware ceiling. Elasticity is what turns peak season from a threat into a non-event.
Rather than trust the design on paper, we load-tested against realistic peak-day traffic and tuned until it held with headroom. Proving capacity against real traffic patterns is what gave the business confidence going into peak.
The cutover was scheduled well ahead of the trading calendar, so the new estate had settled before the rush, and we kept a rollback path ready in case peak revealed anything the tests did not. Nothing was left to chance on the day that mattered most.
- Zero outages through record peak-day traffic
- Elastic capacity replaces fixed hardware
- Cut over ahead of the trading calendar
- Load-tested against realistic peak with headroom to spare
More Cloud & DevOps case studies

Datacenter exit for an NHS hospital group
Migrated 900 clinical workloads off two datacentres to the cloud with zero downtime on patient-facing systems.
Read the full case study
Factory-systems migration for a manufacturer
Lifted MES and quality systems to the cloud across nine plants, cutting infrastructure cost 34%.
Read the full case study
Connected-vehicle platform for a carmaker
Built a cloud platform ingesting telemetry from 1.2M connected vehicles at scale.
Read the full case studyGet a senior architect on the call, first time, every time.
No SDR gauntlet. 30 minutes with an engineer who can scope the problem, name the risks, and give you an honest feasibility call.