GxP and Annex 11 compliance for a pharma manufacturer
Reached validated Annex 11 compliance for a pharma manufacturer in 12 weeks.
12 weeks
Problem, approach, and the outcome
The client is a Swiss pharmaceutical manufacturer whose computerised systems were shipping faster than validation could keep pace. Under GxP, the gap between what is live and what is validated is a real regulatory and supply risk.
Validation existed in pockets rather than as a coherent, evidenced programme the business could point to.
Computerised systems were shipping faster than validation could keep up, leaving a widening gap between what was live and what was evidenced. The gap grew with every release.
There was no coherent, joined-up programme: validation existed in pockets, not as a standard the business could point to. Fragmented effort could not be assured as a whole.
With GxP obligations in force, that gap was a genuine regulatory and supply risk. Closing it was a necessity, not a nice-to-have.
We mapped the systems to GAMP 5 and Annex 11, categorising by risk so effort landed where it mattered rather than being spread evenly. Risk-based prioritisation is what delivered validated compliance in 12 weeks.
We closed the gaps that carried real regulatory weight first, and automated the collection of validation evidence so it stays current instead of decaying. Automated evidence keeps compliance live rather than a point-in-time snapshot.
The programme was designed to be sustainable after we left, not a one-off scramble, and we worked alongside the quality team so ownership transferred as we went. The manufacturer was left able to run it themselves.
- Validated Annex 11 compliance in 12 weeks
- Gaps closed by risk category
- Validation evidence automated and kept current
- A sustainable programme owned by the quality team
More Cybersecurity case studies

ISO 27001 and DTAC for a telemedicine platform
Achieved ISO 27001 and NHS DTAC assurance at first assessment for a telemedicine platform.
Read the full case study
DORA readiness for an insurer
Reached DORA operational-resilience readiness in 11 weeks for an insurer.
Read the full case study
Red-team engagement against a fintech app
Found and helped close three account-takeover paths before a fintech's launch.
Read the full case studyGet a senior architect on the call, first time, every time.
No SDR gauntlet. 30 minutes with an engineer who can scope the problem, name the risks, and give you an honest feasibility call.
